| WESTPORT TERMINAL RR | new August 06 update Nov 07 | 
|  [home]           
            [Contact]    
            [Sitemap]    
            [Layout History]    
            [Rosters]    [WT]    
            [The History 
            of Westport Terminal RR]    [room]    
            [virtual layouttour]    
            [New Yard]   [Pictures 
            1 ]    [Pictures 
            2 ]    [Pictures 
            3 ]    [Pictures 
            4 ]       [Layout 
            photos] [How to scratch build turnouts] and [crossings] [Manual thrown Peco turnouts] [switch stands] [Movable magnets] [DCC] [beacon light] [CB&Q 173] [RS-1 and weathering] [tender pick up 0-8-0] [ Track Cleaning Transfer Caboose ] [ Signal Bridge ] [Operation] [Way of Hopper BN 25 3 84] [WT RR industries shipping & receiving] download Excel [carcards&waybills] 900kB [staging] [Harbor District] [Plywood District] [Third Street Industrial District] [track scale, structures] [Operating gates] [Waterfront Structures] [trestle] [Interchange Cars] [car exchange] [pass exchange] [electronic rail pass ] [ video ] | 

back to page 1 following part 3 or or page 4 (operating the yard)
The plan:
The right - east - side
The throat is ready for installing:
 
      And some tracks for the first train! The turnout points are spiked. As with 
      the prototype, when special trains run. First came the vacuum cleaner with 
      some test cars.
 
      Then suddenly derailed a train traveling to the left. A quick review revealed 
      the reason. With a guard rails still lacked, so this train had problems. 
      The next step was from the opposite direction, that is not a problem. And 
      then, the guard rails are soldered.
A crossing had to be build:
And so are some tracks! Now, again turnouts can be supplied.
 
      For two Arrival - Departure tracks, I have a moveable magnet installed. 
      Those two tracks have a connection, so that the train can be easily separated. 
      The magnet, as shown in the right picture to be seen, is moved with a rod.
 
      Similarly, I "had" to scratch build another turnout. This time 
      a "dummy" without function. The points are soldered on! I have 
      the template of Fast 
      Tracks used because the ties were already included. Also, I have wooden 
      sleepers and few PC-Board ties used. 
      With Peco turnouts I've made a sure electric contact as usual and you 
      see here.
 
      As of Sept. 10, 2006, Benjamin has started with the tower panel. (According 
      to the prototype are only those turnouts with remote control, the yard master 
      switches for trains, all other turnouts are manually thrown. manually thrown 
      turnouts in the use of trains are shown with LEDs in the panel!):
 
      And now comes the operation of the turnuts and wiring. For the Tortoise 
      an idea was needed. The normal version requires installation of approximately 
      8 cm space. I had just 5.5 cm! The solution was the horizontal mounting. 
    
 
      After the wiring is the operational test. But "cold" has been 
      everything worked.
back to the first page, and more part 3
|  [home]           
            [Contact]    
            [Sitemap]   [WT]    
            [The History 
            of Westport Terminal RR]    [room]    
            [virtual layouttour]   
                [New Yard]    
            [Pictures 
            1 ]   [Pictures 
            2 ]   [Pictures 
            3 ]   [Pictures 
            4 ]    [Layout 
            photos] [How to scratch build turnouts] and [crossings] [Manual thrown Peco turnouts] [switch stands] [Movable magnets] [DCC] [beacon light] [CB&Q 173] [RS-1 and weathering] [tender pick up 0-8-0] [ Track Cleaning Transfer Caboose ] [ Signal Bridge ] [Operation] [Way of Hopper BN 25 3 84] [WT RR industries shipping & receiving] download Excel [carcards&waybills] 900kB [staging] [Harbor District] [Plywood District] [Third Street Industrial District] [track scale, structures] [Operating gates] [Waterfront Structures] [trestle] [Interchange Cars] [car exchange] [pass exchange] [electronic rail pass ] [ video ] |